+88 02 488 11 933, +880 1888 818 477 |
---|
Project Information
Name of Project: Super Flat Floor at Akij Ceramics
Name of Client: Akij Ceramics Ltd.
Project Location: Bagar Bazar, Mymenshingh
Working Area: 22,006 SFT
Work Pattern: Floor Levelling work and Hardener Application
Product Used: Dutop 100
Thickness: To ensure Floor Flatness Average Deviation (-5 mm)(+5 mm)
Challenge: To hand over the project with smooth floor flatness FF+35, As the previous contractors Failed to do so,( Lite Engineering)
Application By: Fountech Application Team
Project Duration: 8 days.
Total work order amount 1012000 sft. The first phase work 5006 sft was very good and the authority of akij was very Happy. But the second phase of the work due to the slump the work was not up to the mark there was so much deviation up to +21 and -11 so it was a very disappointing moment for all of us. Then the third phase of work was good. But there was only one deviation above +11
As it was our first-floor leveling work it was a treat challenge to meet the above conditions of the authority of akij, but our performance is quite good enough for any first timer! So i think we will do better in floor levelling from this works wrong side. I think its a great achievement for us. And a new part of our work has begun.